Avoid DWTC Power Traps at Arab Health 2026

Avoid DWTC Power Traps at Arab Health 2026

Avoid DWTC three-phase power orders at Arab Health 2026

At Arab Health 2026 (Dubai World Trade Centre, 26 629 Jan 2026) a single incorrect connection can stop a demo, cost thousands in surcharges and damage hard-won buyer meetings. The phrase DWTC three-phase power orders should be on every exhibitor's critical path: wrong plug type, late ordering or an untested high-inrush device are the most common causes of on-site failures.

Why Arab Health is a power-risk event (scale & stakes)

Scale and the stakes

  • Expected exhibitors: ~3,450 63,600.
  • Professional visits: ~110,000 6130,000.
  • High-density halls, simultaneous builds and heavy demo schedules multiply electrical risk.

Typical mission-critical loads

  • Refrigeration units for samples and pharma demos (continuous run).
  • Medical imaging or diagnostic rigs (sensitive to voltage/drop and inrush currents).
  • Server racks and AV systems powering live presentations and remote demos.

Consequences of failure: demo cancellations, lost contracts, on-site transformer rental, relocation fees and 20 650% late-order surcharges.

DWTC three-phase power orders: electrical rules every exhibitor must know

Event Plus portal & tiered deadlines

  • All electrical orders must be placed via DWTC's Event Plus portal.
  • Tiered pricing: Early (>30 days), Standard (~15 621 days), Late/On-site (<14 days). Late orders are subject to availability and 20 650% surcharges.

Mandatory grid plan and inspection

  • Exhibitors must submit a dimensioned grid plan showing the exact drop location for the three-phase supply.
  • DWTC requires a mandatory electrical inspection and approval before energising.

Connector standards, amperages & 24-hour power

  • Three-phase power is delivered on IEC 60309 (red CEE) 5-pin connectors typically in 32A, 63A and 125A variants.
  • Order "24-hour power" separately to prevent nightly shut-offs that stop refrigeration or server uptime.
  • Expect VAT and venue surcharges as part of Event Plus billing.

Top 5 exhibitor mistakes that cause power failures

1. Wrong plug or voltage specification

Case: An imaging demo ordered a standard single-phase 240V supply instead of a 63A three-phase CEE. Result: immediate failure to energise, emergency transformer hire and lost demo time; 25% surcharge applied.

2. Missing or inaccurate grid plan

Case: Exhibitor failed to show drop coordinates; power delivered three metres from the stand. Consequence: last-minute cable runs, relocation fees and breaches of DWTC routing rules.

3. Ignoring inrush current and protection

Case: Refrigeration compressors and medical pumps caused nuisance tripping due to high motor inrush. Result: repeated breaker trips, demo downtime and reputation damage.

4. Ordering power late

Case: A late Event Plus order was accepted only at a 40% surcharge and on-site availability forced a smaller feed needing onsite distribution modification.

5. Under-specifying distribution and protection

Case: No local distribution board or RCD protection specified; equipment failed DWTC inspection and could not be energised until remedial works were done by venue electricians (charged at premium rates).

How Burdak solves the power problem (technical RAG mapping)

We map every stand's electrical risk using a technical RAG (Red-Amber-Green) process: red = high-risk (medical imaging, compressors), amber = critical AV/servers, green = lighting/low-draw equipment. For each status we deliver a matched mitigation package.

  • In-house fabrication of pre-wired distribution boards sized to DWTC connector amperages (32A/63A/125A).
  • CNC-cut housings for robust, stamped enclosures that pass DWTC inspection and isolate live parts safely.
  • Full-scale factory mock-ups and load testing: we replicate your stand and run full electrical load tests, including verified inrush measurements.
  • DWTC-ready RAMS (Risk Assessment Method Statement) and detailed shop drawings with labelled drop points for Event Plus grid submissions.
  • Labelled, sequenced packing that matches build order so electrical panels are installed and verified before critical equipment is connected.
  • Coordinated handoff to DWTC electrical teams to accelerate inspection and energisation at show open.

These measures reduce on-site build time by the industry-observed 40 660% and cut last-mile premiums that regional suppliers typically charge (10 30%).

Practical 30/21/14-day exhibitor checklist & template steps

30+ days (Early)

  • Place Event Plus orders for three-phase supply (Early tier) and request 24-hour power.
  • Submit dimensioned grid plan with exact drop location.
  • Send initial electrical load sheet to your technical supplier and Burdak for RAG mapping.

21 615 days (Standard)

  • Finalise distribution design, order pre-wired DBs and protective devices.
  • Confirm factory mock-up schedule with Burdak; run preliminary inrush tests.
  • Submit DWTC-ready RAMS and shop drawings.

<14 days (Late / On-site)

  • Expect 20 650% surcharges; confirm availability and contingency for temporary transformers or re-siting.
  • Run final pre-assembly full-load test before crating; label sequenced packing.
  • Confirm emergency contact script and on-site handover time with DWTC electrical team.

Essential pre-assembly tests (template)

  • Continuity and insulation resistance tests on distribution circuits.
  • Full-load run to capture steady-state current and peak inrush values.
  • Verification of RCD tripping times and selective coordination of MCCBs.

RAMS / electrical load sheet template (key fields)

  • Stand reference / Hall / Stand size
  • Declared device list with steady-state and inrush currents
  • Requested supply: phase, voltage, amperage, connector type (IEC 60309)
  • 24-hour power requirement: yes/no
  • Contact names and emergency numbers

Emergency contact script (for venue / freight handler)

"This is [Company], Stand [No.], Hall [X], Arab Health 2026. We have a confirmed Event Plus order for a [32A/63A/125A] IEC 60309 three-phase drop at [coordinate]. Please contact our onsite technical lead [Name] at [+971 X XXX XXXX] if there is any change to drop time or location."

FAQ

  • Q: What connector types are used at DWTC for three-phase supplies?
    A: IEC 60309 red CEE 5-pin in 32A, 63A and 125A variants are standard.
  • Q: When must I place power orders to avoid surcharges?
    A: Order >30 days (Early) to avoid 20 650% late surcharges; Standard is ~15 621 days.
  • Q: Is 24-hour power automatic?
    A: No. 24-hour power must be ordered separately to prevent nightly shut-offs.
  • Q: What happens if my equipment trips breakers on-site?
    A: You may face demo downtime, DWTC remedial charges, and premium emergency electrician rates; pre-assembly load testing prevents this.
  • Q: How does Burdak help exhibitors?
    A: We provide in-house fabrication of pre-wired DBs, CNC housings, DWTC-ready RAMS/shop drawings, full-scale 3D mock-ups and load testing, and coordinated handoff to venue teams.

Ready to lock your DWTC three-phase power orders and avoid on-site failure? Contact Burdak Technical Services to schedule a pre-assembly mock-up and full load test before shipment.